RoboGrid Inspect
3
Online

Activity Log

12 entries
  1. 10:02:41Edge

    Critical hotspot detected on Panel ID 23 (72.4 °C)

  2. 10:02:38Robot

    ArUco marker ID 23 read, panel validation successful

  3. 10:01:12Robot

    Arrived at waypoint 3 — Main Panel Floor 1

  4. 09:58:12Edge

    Panel ID 17 busbar temperature above baseline (61.3 °C)

  5. 09:55:03Sistem

    Inspection data sync to server successful (24 records)

  6. 09:47:55Edge

    Slight temperature rise on Panel ID 9 (45.2 °C), normal

  7. 09:41:20Operator

    Operator 1 initiated mission MG-2026-05-22-02

  8. 09:30:00Sistem

    Scheduled mission MG-2026-05-22-02 started automatically

  9. 09:12:44Robot

    Obstacle detected in corridor, route recalculated

  10. 08:40:10Robot

    Returned to dock, battery charging started

  11. 08:12:05Sistem

    Thermal emissivity calibration complete (value 0.95)

  12. 08:00:00Operator

    Operator 1 logged in to dashboard